Project Description:
Design Build Manager for the installation of 230 overhead pantograph and cable reel dispenser bus charging systems at three NYCT bus depot locations throughout the Metro NYC area. Project is being implemented in a fast track format utilizing multiple Design-Build Teams, ABB and Heliox charging equipment technology and INIT Charge Management Software. Work is taking place within the following existing bus depots with strict logistical restrictions:
- Gun Hill Bus Depot – 72 Pantographs
- Queens Village Bus Depots – 132 Pantographs
- M.J. Quill Bus Depot – 26 cable reel chargers
Project Details
Client:
New York City Transit (NYCT)
Location:
New York, NY (Multiple Depot Locations)
Contract Value:
$190,000,000
Guth DeConzo Role:
Design Build Manager/Construction Manager
Design Consultants:
- STV
- MP Engineering
Major Subcontractor/Suppliers:
- PJS Group
- E-J Electrical Installation
- Multi-Phase Electric
- ABB, Heliox
- Shunk
- Stemmann
Project Status and Schedule:
December, 2026